Send the form and we contact you within 5 minutes

Water supply for a new house in Riga and the Riga region

Water supply for a new house has to be planned earlier than it seems: the builders already need water, the entry through the foundation must be left before the concrete is poured, and the drilling rig has to reach the spot before landscaping starts.

Price depends on the job depends on the source, the distance to the house and the filters; prices for the parts below

After you submit the form, we contact you within 5 minutes

Water supply for a new house in Riga and the Riga region
Drawing water supply for a new house spicesierikosanariga.lv

Get a price

Name, phone and address are required. The rest helps us give a more accurate price.

After you submit the form, we contact you within 5 minutes

In Riga and the Riga region we install the water source for a new house and build the system up to the utility room so that it fits the house design. In your request, say what stage the construction is at and whether the house has a design.

Why the water source should come first

  • Construction needs water for concrete, mortar, plaster and cleaning. A spike well (“spice” in Latvian) or a borehole replaces carting water in cans from the very first season.
  • The drilling rig and the excavator need access. Once the fence, paving and lawn are finished, this becomes harder and more expensive.
  • The water test can be done in good time and the filters chosen before the utility room is laid out.
  • If it turns out there is little water or it is unsuitable, there is time to choose another source without changing the house plan.

Spike well, borehole or mains water

If there is a water main in the street, first find out the connection options and conditions from the water utility: connecting to mains water. If there is none, the choice is usually between a spike well and a borehole.

A spike well suits sites where the groundwater is close to the surface and consumption is not high. A borehole takes water from deeper layers, and the amount of water usually depends less on drought. Comparison: spike well or borehole.

What to allow for in the house design and the foundation

  • An entry through the foundation or the floor slab: a protective sleeve at the utility room position that comes out below the frost depth.
  • A utility room that stays above zero all year, with electricity for the pump, space for the pressure tank and filters, and a way to drain the filter backwash water.
  • A separate circuit breaker for the pump. For a submersible pump the cable goes in the same trench as the water pipe.
  • The shortest route from the source to the house, if possible not under a future driveway and away from where a septic tank is planned.
  • A source location that can still be reached later, when the pump needs replacing or the borehole needs cleaning.

We mark the source location and the route on the plan. Then you will not damage the water pipe when digging trenches for other utilities or planting trees.

Documents for a new well or borehole

A water abstraction well and a borehole, including a spike well, are first-group engineering structures. For a new structure you submit an explanatory memorandum (paskaidrojuma raksts) to the municipal building authority (būvvalde). If the borehole is deeper than 20 m or you plan to take more than 10 m³ of water a day, the drilling company obtains a licence from the State Environmental Service (VVD) before the work (state fee €35.57). After the borehole is created, the drilling company prepares the borehole passport, and the Latvian Environment, Geology and Meteorology Centre (LVĢMC) approves it within 10 working days. The LVĢMC fee is €115.34; it is a fee set by the state, not our price.

Municipal practice differs, and VVD explanatory materials use different terms in places, so check with your building authority before the work. If the house has a building design, check whether the water source and the water supply are already included in it. More detail: borehole registration.

Cabinet Regulation No. 500 (General Construction Regulations), Annex 1 (first-group engineering structures); Cabinet Regulation No. 253 (engineering structures), point 6.², sub-point 1 (explanatory memorandum); LBN 222-15, point 64 (a driven well is a borehole); the law “On Subterranean Depths”, Section 11(1), point 2; Cabinet Regulation No. 1055, point 2.13 (fee €35.57); Cabinet Regulation No. 696 on subsoil licences, points 13 and 16, and LVĢMC service 09-35 (borehole passport, 10 working days); Cabinet Regulation No. 752, Annex, point 2.1 (€115.34, VAT not applied). Sources: likumi.lv, lvgmc.lv, checked 03.11.2026.

How we work on a new build

  1. Plan We look at the plot and the design and agree on the source location, the route and the entry.
  2. Source We install a spike well or a borehole. For the construction period a temporary pump and tap can be connected.
  3. Water pipe Once the foundation is ready, we lay the pipe from the source to the entry below the frost depth.
  4. Plant room Once the house is roofed and the room does not freeze, we install the pump with the pressure tank and pressure switch, and the filters chosen by the test.

How much does water supply for a new house cost

The total price depends on the source and the distance to the house. Spike well installation costs from €350 (without the pump, pressure tank and connection to the house). A borehole costs from €65/m, a borehole ~30 m deep from €2,000. Installing a submersible pump costs from €200 (pump extra).

We price the water pipe and the utility room once the plan is ready. On a new build the price is often lower because there is no lawn or paving to restore and the entry has a ready sleeve. All prices: prices.

Page updated 3 November 2026. Prices and rules checked on this date.

Price for this job
Service Price
Water supply for a new house, the whole system depends on the source, the distance to the house and the filters; prices for the parts below depends on the job
Spike well installation without the pump, pressure tank and connection to the house from €350
Borehole PVC casing from €65/m
Borehole ~30 m without the pump and the pipe run from €2,000
Submersible pump installation pump extra from €200
Request water supply for a new house

We contact you within 5 minutes of your request.

Frequently asked questions

Can a spike well be installed before house construction starts?

Yes, and it is often more convenient: the site has water, and the machinery does not get in the way of landscaping. The source location just has to match the planned position of the house and the pipe route.

The foundation has already been poured without a sleeve. Can an entry still be made?

Yes, we drill an opening in the foundation and seal it. It is more work than a ready sleeve, and the foundation insulation has to be restored at that spot.

When should filters be installed in a new house?

After the water test, and once the utility room is dry and does not freeze. A new spike well or borehole can give cloudy water in the first weeks, so we take the sample once the source has been flushed.

Can water be taken from a spike well during construction without a pressure tank?

Yes, with a simple pump and a tap. Once the house is finished, the temporary setup is replaced by a permanent pump or pump station with a pressure tank in the utility room.

Request water supply for a new house

Give your name, phone and address. A specialist contacts you within 5 minutes to confirm the job and the price.

Get a price

Name, phone and address are required. The rest helps us give a more accurate price.

After you submit the form, we contact you within 5 minutes

Get a price we contact you within 5 minutes