Send the form and we contact you within 5 minutes

Borehole for a business or a private house in Rumbula - while the Dārziņi network is still only a plan

A borehole in Rumbula is needed both by warehouses, factories and car repair shops and by detached houses, because in the 2025 report of Rīgas ūdens (Riga's water utility) Rumbula is listed among the neighbourhoods where services are only partly available.

Price from €65/m PVC casing

After you submit the form, we contact you within 5 minutes

Plan of a private plot with the house, a dug well, a borehole cover and the underground water pipe to the house
Plot boundary
Water pipe
Dug well
Borehole
Rumbula · typical solution Drawing · site plan spicesierikosanariga.lv

Get a price

Name, phone and address are required. The rest helps us give a more accurate price.

After you submit the form, we contact you within 5 minutes

Rīgas ūdens states that the planned Dārziņi water supply and sewerage system would also allow Rumbula businesses to connect, but its feasibility study is scheduled for 2025–2027 and construction possibly by 2039. So here we choose a source for the long term: drilling from €65/m, a borehole about 30 m deep from €2,000.

Water in Rumbula: part of the neighbourhood without a network

Rumbula is a neighbourhood on the south-eastern outskirts, along Maskavas iela, the railway and the A6 route, with warehouses, retail, production, car repair shops, detached houses and large sparsely built areas. Rīgas ūdens places it in the group of small neighbourhoods where water supply or sewerage is not available, or only partly available, in some places, but does not name the streets.

The only public plan that touches Rumbula is the Dārziņi water management project. Riga City Council has backed it, and Rīgas ūdens writes that in future it would also allow businesses in the Rumbula industrial zone to connect. The feasibility study is scheduled for 2025–2027, while the network may be built by 2039. For a business that needs water now, this means at least ten years on its own source.

For a business: how much water and which permits

A warehouse with a few staff needs water only for the washrooms and a kitchen. For a car repair shop or a factory, use is higher and uneven, for example for washing. So before drilling we work out with you the maximum daily use and how many people will use this water, because the documents depend on both figures.

  • A borehole up to 20 m deep and no more than 10 m³ per day: no licence from the State Environmental Service (VVD) needed.
  • A deeper borehole or larger abstraction: the drilling company applies for the licence, state fee €35.57.
  • 10 m³ per day or more, or more than 50 people use the water: a VVD water use permit (Cabinet Regulation No. 736 on water use permits).
  • Abstraction above 10 m³ per day: natural resources tax on water abstraction.

Another limit is the drinking water regulation. Cabinet Regulation No. 547 on drinking water does not apply to a source used by fewer than 50 people or from which on average up to 10 m³ per day is taken, if the water is not used in a public building. For a larger business this exception no longer applies, and the monitoring requirements have to be planned at the design stage. More: borehole for a business.

Where to put the source among warehouses and car repair shops

On sites with car repair shops, fuel or chemical storage and heavy traffic next door, the borehole location matters more than in a garden. We choose a spot away from such sites and from rainwater run-off, and seal the borehole head so that surface water does not run in along the outside of the casing.

After drilling we recommend the full test (from €95). If petroleum products are handled next door, we will ask the laboratory about extra parameters; we quote their price from the laboratory's offer. If the water has iron or manganese, we select iron removal: water treatment.

For a detached house in Rumbula

For private houses in Rumbula, the same solutions work as in other outskirts of Riga without a network. The Daugava is close and there are large open areas around, so the groundwater level is worth finding out for each plot from the neighbours' sources. If the water is close to the surface, a spike well in Rumbula (“spice” in Latvian) from €350 works. If the water is deeper or the spike well water is cloudy, we will suggest a borehole with a submersible pump.

When the network arrives: what to do with the borehole

If a water main is built in the street years from now and you connect, the borehole has two lawful options. You can keep it for process water or watering, but only as a separate system: Riga City Council binding regulations No. 17 forbid connecting the network of a water abstraction borehole to the city water main, including through the building's internal network.

If you will no longer use the borehole, Cabinet Regulation No. 696 on subsoil licences requires it to be mothballed or decommissioned, and a decommissioning report is drawn up. We price decommissioning after hearing the situation, because it depends on the depth, the diameter and what is left in the borehole: borehole decommissioning.

Sources: Rīgas ūdens, contract performance report for 2025 (Rumbula); its news item on the Dārziņi water management project (Rumbula businesses, feasibility study 2025–2027, construction possibly by 2039); the law “On Subterranean Depths”, point 2 of the first part of Section 11; Cabinet Regulation No. 1055, 2.13; Cabinet Regulation No. 736, 2.1; the Natural Resources Tax Law, Section 19; Cabinet Regulation No. 547, 4.5; Riga City Council binding regulations No. 17, 63.6; Cabinet Regulation No. 696, point 21 and Annex 9. Checked 03.11.2026.

Services and prices in Rumbula

Nearby neighbourhoods: Šķirotava, Dārziņi, Ķengarags and Katlakalns. All Riga neighbourhoods: Riga.

Page updated 3 November 2026. Prices and rules checked on this date.

Price for this job
Service Price
Borehole drilling PVC casing from €65/m
Borehole ~30 m without pump and pipe run from €2,000
Borehole equipment without pump from €500
Borehole cleaning €400–700 from €400
Water test, full chemistry and microbiology from €95
Request a borehole in Rumbula

We contact you within 5 minutes of your request.

Frequently asked questions

Is it worth drilling in Rumbula if there will one day be a Dārziņi network?

If you need water now, usually yes. In the public plan the feasibility study is scheduled for 2025–2027 and construction possibly by 2039, and it is not promised for every street. A borehole serves for many years, and after connection it can be kept for process water as a separate system or decommissioned.

Does a warehouse in Rumbula need a water use permit?

Only if abstraction is 10 m³ per day or more, or if more than 50 people use the water. A warehouse with a small number of staff and no process water usually manages with a borehole without a permit. Write the number of staff and the water needs in your request, and we will tell you which group you are in.

How do I check whether there is a water main by my property in Rumbula?

Fill in the “Service availability” (Pakalpojuma pieejamība) form of Rīgas ūdens or enter the address in the vaitevtovajag.lv tool. If a connection is possible, Rīgas ūdens prepares the technical conditions within 11 working days free of charge.

Request a borehole in Rumbula

Give your name, phone and address. A specialist contacts you within 5 minutes to confirm the job and the price.

Get a price

Name, phone and address are required. The rest helps us give a more accurate price.

After you submit the form, we contact you within 5 minutes

Get a price we contact you within 5 minutes